Parenthetical Recluse

being from the life/shed/whim of tyler w weaver

  • about
  • projects
  • newsletter
  • contact

greenhouse, day eleven

September 15, 2026 by Tyler W. Weaver in 2026w38

Exterior frame trim done and floor begun: using cutoff scrap from the exterior for at least the middle section of the floor. Unless something comes to me, I’m taking tomorrow off from this beast to replace the kitchen sink drain piping and play with metal, perhaps in that order.

September 15, 2026 /Tyler W. Weaver
projects, project kreenhouse, greenhouse, backyard, total assembly required
2026w38
  • Newer
  • Older

© 2026 Tyler W. Weaver :: rss