metal+_0155 :: slow dance on the long walk home

Greenhouse build cutoffs + antique door lock bits + steel rods + spray paint + acrylic

greenhouse, day 12

After a day of much-needed rest that I didn’t get (spent it fighting a losing fight with the kitchen drain), returned to greenhouse construction. Floor: complete. Painting: started, under K’s hand (I just build, I don’t paint; everyone’s happier this way). Ramp: built. Rear panel trim: installed. The end, she nears.