Parenthetical Recluse

(or, the internet hermitage of tyler w. weaver)

  • about
  • projects
  • (in)tangible
  • RSS

(nu)sanctum/20240811

August 11, 2024 by Tyler W. Weaver in 2024w33

Ceilings, walls, and eaves are done. Gaps in the walls on the right and left are the next pieces to tackle: wrap-around shelving for under the eaves and above those workstations (I’ll also build shelving for under the stand-up desks. Bit by bit, (Nu)Sanctum comes to life…

(Nu)Sanctum - lots of wood, lots of nails and messy messiness.
August 11, 2024 /Tyler W. Weaver
project nu-sanctum, total assembly required, workspaces, shiplapping
2024w33

(nu)ceiling

August 09, 2024 by Tyler W. Weaver in 2024w32

Decided I wasn’t feeling the metal ceiling in NuSanctum, so I tore it out and put in a new one. And that's what I did with my day.

shiplapped ceiling, redwood stain on top beam
August 09, 2024 /Tyler W. Weaver
project nu-sanctum, ceiling, shiplapping, total assembly required
2024w32

walls(!)

August 03, 2024 by Tyler W. Weaver in 2023w31

About halfway done with the ship-lapping of the shed. No clue what the color will eventually be; I’m making this up as I go along.

August 03, 2024 /Tyler W. Weaver
shiplapping, total assembly required, workspaces, project nu-sanctum
2023w31

say hi

© 2020-2025 Tyler W. Weaver